The Project

  • $4.3Bn new 640,000m2 passenger terminal
  • Advanced baggage handling system
  • Departure gates and airway bridges
  • 56-room hotel for transit passengers
  • Duty-free shops and commercial centres
 

How was Flow used?

  • Structured the programme of the design works
  • Defined the complexity of the project
  • Optimized the design delivery sequence
  • Integrated design & procurement schedules
  • Active management and control of design delivery
 

Benefits

  • On-time delivery of design
  • Design-construction optimisation led to predictability in design delivery
  • Design schedule optimisation provided assurance of baseline schedule for key delivery milestones achievement
  • Geo-multi-disciplinary design team aligned and integrated

Share